Hardened building for crew and equipment protection.
Added around 1964. Radar and Control Vans were inside. Building provided fallout protection.
View of the rear of the hardened fallout protection
building. The Radar and Control Vans were behind the large doors. To the right is a underground water storage tank added
by the City of Waukesha. Inside the fence above the tank are tennis courts.
View from headquarters area to the west. Remains
of the radar towers on the left and the crew and equipment building on the right. That is a 3 story appartment building
beyond the site in the middle. The fence above the water tank is barely visible.